11/8/44 0800Hrs KG "von Schroif" is tasked to secure the Line of Departure for a planned
assault to secure a bridgehead over the CZARNA River.
Battle Type: | Axis Probe | Date: | 1944/08/11 |
Time: | Dawn 08:00 | Length: | 01:30 |
Size: | Medium | Terrain: | Open |
Map Size: | w: 1184 m d: 1024 m | Area: | 1.212 Sq. km |
Region: | Eastern Europe | Early Intel: | Neither |
Weather: | Mist and Cool | Ground Conditions: | Damp |
theBlitz Size Modifier: | 7 | ||
Filename: | Mission2a_Feuer und Bewegung_v2.btt |